Advanced Space Transportation Program (ASTP)
NASA's X-37 Approach and Landing Test Vehicle is installed is a structural facility at Boeing's Huntington Beach, California plant, where technicians make adjustments to composite panels. Tests, completed in July, were conducted to verify the structural integrity of the vehicle in preparation for atmospheric flight tests. Atmospheric flight tests of the Approach and Landing Test Vehicle are scheduled for 2004 and flight tests of the Orbital Vehicle are scheduled for 2006. The X-37 experimental launch vehicle is roughly 27.5 feet (8.3 meters) long and 15 feet (4.5 meters) in wingspan. It's experiment bay is 7 feet (2.1 meters) long and 4 feet (1.2 meters) in diameter. Designed to operate in both the orbital and reentry phases of flight, the X-37 will increase both safety and reliability, while reducing launch costs from $10,000 per pound to $1,000.00 per pound. The X-37 program is managed by the Marshall Space Flight Center and built by the Boeing Company.
- Date
- 2003-07-01
- Collection
- MSFC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Advanced Space Transportation Program (ASTP)" (2003-07-01). NASA/MSFC. Public domain. https://images.nasa.gov/details/0301769Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 90870.
More like this

Advanced Concept
2000-06-22 · NASA Image and Video Library

Advanced Concept
1999-08-13 · NASA Image and Video Library

Advanced Space Transportation Program (ASTP)
1995-01-23 · NASA Image and Video Library

X-33
2004-04-15 · NASA Image and Video Library

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility
2003-12-05 · NASA Image and Video Library

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processi
2003-12-05 · NASA Image and Video Library

KSC-95PC-1195
1995-08-14 · NASA Image and Video Library

One Year Before Mission Success
2004-04-29 · NASA Image and Video Library
