Artemis I and II Production Updates
The heat shield for Orion’s Artemis ll, NASA’s first crewed mission, is inside the Neil Armstrong Operations and Checkout Building high bay at the agency’s Kennedy Space Center in Florida on Sept. 17, 2019. The heat shield, measuring roughly 16 feet in diameter, will protect astronauts upon re-entry. The heat shield is a base titanium truss structure. Technicians will apply Avcoat, an ablative material that will provide the thermal protection needed to withstand the harsh environment of space and during re-entry. Artemis ll will confirm all of the spacecraft’s systems operate as designed in the actual environment of deep space with astronauts aboard.
- Date
- 2019-09-17
- Photographer / author
- NASA/Frank Michaux
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis I and II Production Updates" (2019-09-17). NASA/KSC/NASA/Frank Michaux. Public domain. https://images.nasa.gov/details/KSC-20190917-PH_FWM01_0093Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 9946.
More like this

Artemis II Heat Shield
2020-07-02 · NASA Image and Video Library

Artemis II Flight Hardware
2022-01-20 · NASA Image and Video Library

Artemis I and II Production Updates
2019-09-17 · NASA Image and Video Library

Artemis I and II Production Updates
2019-09-17 · NASA Image and Video Library

Artemis I and II Production Updates
2019-09-17 · NASA Image and Video Library

Artemis II Heat Shield Installation
2023-06-23 · NASA Image and Video Library

Artemis I and II Production Updates
2019-09-17 · NASA Image and Video Library
