Artemis I Core Stage Offload to VAB
The massive 212-foot long Space Launch System (SLS) core stage is shown being offloaded from the Pegasus Barge on April 29, 2021, after arriving at NASA’s Kennedy Space Center in Florida. Teams with Exploration Ground Systems (EGS) and lead contractor Jacobs will transfer the rocket stage to the center’s Vehicle Assembly Building to prepare it for integration with the completed stack of solid rocket boosters atop the mobile launcher ahead of the Artemis I launch. The first in a series of increasingly complex missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon.
- Date
- 2021-04-29
- Photographer / author
- NASA/Kim Shiflett
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis I Core Stage Offload to VAB" (2021-04-29). NASA/KSC/NASA/Kim Shiflett. Public domain. https://images.nasa.gov/details/KSC-20210429-PH-KLS01_0115Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 82711.
More like this

Artemis I Core Stage Offload to VAB
2021-04-29 · NASA Image and Video Library

Artemis I Core Stage Arrival at KSC
2021-04-27 · NASA Image and Video Library

Artemis I Core Stage Offload to VAB
2021-04-29 · NASA Image and Video Library

Artemis I Core Stage Arrival at KSC
2021-04-27 · NASA Image and Video Library

Artemis I Core Stage Arrival at KSC: SLS to EGS Handover
2021-04-28 · NASA Image and Video Library

SLS Core Stage Pathfinder Transport to VAB
2019-10-01 · NASA Image and Video Library

SLS Core Stage Pathfinder Transport to VAB
2019-10-01 · NASA Image and Video Library

SLS Core Stage Pathfinder Offload
2019-09-30 · NASA Image and Video Library
