Artemis II Engine Section Moves to Final Assembly
On May 24, 2022, the core stage production team moved the Space Launch System (SLS) rocket engine section for Artemis II to the core stage final integration area at NASA’s Michoud Assembly Facility in New Orleans. While there, the engine section team is completing installation of the main propulsion systems, finishing integration of the electrical and avionics systems, and preparing for functional testing of the various systems. During final integration, the team also will install remaining internal thermal protection systems and prepare to position the engine section from vertical to horizontal so that it can be joined with the rest of the core stage. The engine section is located at the bottom of the core stage and includes the rocket’s main propulsion systems that connect to the core stage’s four RS-25 engines that will help launch the Artemis II lunar mission. This fall, the engine section will be horizontally integrated with the previously-joined forward assembly and liquid hydrogen tank to complete the core stage. NASA and core stage lead contractor Boeing are building core stages for the next three Artemis missions. The 212-foot core stage with its RS-25 engines will provide
- Date
- 2022-05-24
- Photographer / author
- Jared Lyons
- Collection
- MAF
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis II Engine Section Moves to Final Assembly" (2022-05-24). NASA/MAF/Jared Lyons. Public domain. https://images.nasa.gov/details/MAF_20220524_CS2%20ES%20Move%20to%20Final-1Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 81978.
More like this

Teams Move Artemis II SLS Engine Section into Position for Final Join
2023-02-22 · NASA Image and Video Library

Artemis II Engine Section and Boat-tail Joined
2021-07-08 · NASA Image and Video Library

NASA Moves Artemis IV Engine Section
2022-07-11 · NASA Image and Video Library

NASA Stacks Elements for Upper Portion of Artemis II Core Stage
2021-05-24 · NASA Image and Video Library

NASA Flips Artemis II Engine Section, Prepares for Final Join
2023-02-11 · NASA Image and Video Library
