Artemis II Stacking - Booster Segment Prep for Lift Ops
Down the transfer aisle from the Artemis II SLS (Space Launch System) core stage, engineers and technicians with the Exploration Ground Systems Program attach an overhead crane to the left aft assembly, or bottom portion of the solid rocket boosters for the SLS rocket, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center on Tuesday, Nov. 19, 2024. The crane will lift the aft assembly on top of the mobile launcher 1 followed by the right aft assembly and stack the remaining booster segments for the Artemis II mission.
- Date
- 2024-11-19
- Photographer / author
- NASA/Glenn Benson
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis II Stacking - Booster Segment Prep for Lift Ops" (2024-11-19). NASA/KSC/NASA/Glenn Benson. Public domain. https://images.nasa.gov/details/KSC-20241119-PH-GEB01_0074Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 10475.
More like this

Artemis II Stacking - Booster Segment Lift
2024-11-19 · NASA Image and Video Library

Artemis II Stacking - Booster Segment on ML
2024-11-20 · NASA Image and Video Library

Artemis III booster stacking coverage - RCC Lift/Mate
2026-08-20 · NASA Image and Video Library

EGS Booster Segrment Training
2020-01-08 · NASA Image and Video Library

Artemis III booster stacking coverage - LCC Lift/Mate
2026-08-20 · NASA Image and Video Library

Artemis III SLS Core Stage Integration
2026-10-26 · NASA Image and Video Library
