Artemis III SLS Core Stage Integration
The SLS (Space Launch System) core stage is lifted from the transfer aisle of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Thursday, Oct. 22, 2026. The 212-foot rocket stage is moved using a one-of-a kind lifting beam designed to lift the stage. The core stage will be joined vertically with the completed solid rocket booster motor segments in its short stack configuration. The Artemis III mission will launch crew in the Orion spacecraft on top of the SLS rocket to test rendezvous and docking capabilities between Orion and commercial spacecraft needed to land astronauts on the Moon.
- Date
- 2026-10-22
- Photographer / author
- NASA/Sean Cannon
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis III SLS Core Stage Integration" (2026-10-22). NASA/KSC/NASA/Sean Cannon. Public domain. https://images.nasa.gov/details/KSC-20261022-PH-SNC01_0002Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 81873.
More like this

Artemis III SLS Core Stage Integration
2026-10-25 · NASA Image and Video Library

Artemis III SLS Core Stage Integration
2026-10-25 · NASA Image and Video Library

Artemis III SLS Core Stage Integration
2026-10-26 · NASA Image and Video Library

Artemis III SLS Core Stage Integration
2026-10-26 · NASA Image and Video Library

Artemis III Engine Section 3 Boat Tail in HB2
2025-08-13 · NASA Image and Video Library

Artemis III Core Stage Lift
2026-10-23 · NASA Image and Video Library

Artemis II Engine Section 3 Boat Tail in HB2
2025-08-13 · NASA Image and Video Library

Artemis II Stacking - Booster Segment Lift
2024-11-19 · NASA Image and Video Library
