Artemis III SRB Processing in RPSF
The left-hand and right-hand solid rocket booster aft segments, or bottom sections, for NASA’s Artemis III SLS (Space Launch System) rocket are seen inside the Rotation, Processing and Surge Facility at the agency’s Kennedy Space Center in Florida on Tuesday, April 28, 2026. The SLS rocket’s twin boosters, manufactured by Northrop Grumman in Utah, will provide more than 75 percent of the SLS rocket’s total thrust at launch. The Artemis III mission will launch crew in the Orion spacecraft on top of the SLS rocket to test rendezvous and docking capabilities between Orion and commercial spacecraft needed to land astronauts on the Moon.
- Date
- 2026-04-28
- Photographer / author
- NASA/Glenn Benson
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis III SRB Processing in RPSF" (2026-04-28). NASA/KSC/NASA/Glenn Benson. Public domain. https://images.nasa.gov/details/KSC-20260428-PH-GEB01_0022Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 82553.
More like this

Artemis III SRB Processing in RPSF
2026-06-30 · NASA Image and Video Library

Artemis III Booster Stacking Coverage - LAC Mated
2026-08-10 · NASA Image and Video Library

SLS Booster Aft (Right) Exit Cone Arrival
2019-12-09 · NASA Image and Video Library

SLS Booster Aft (Right) Exit Cone Arrival
2019-12-09 · NASA Image and Video Library

Artemis III Booster Stacking LCC/RCC Mate
2026-09-01 · NASA Image and Video Library

Artemis III Booster Stacking - Right Forward Booster Segment Mated
2026-09-24 · NASA Image and Video Library

SLS Booster Aft (Right) Exit Cone Arrival
2019-12-09 · NASA Image and Video Library

Booster Fabrication Facility SLS Updates
2019-10-16 · NASA Image and Video Library
