Artemis IV Liquid Oxygen Tank Aft Barrel Moves to Next Phase of Production
Move crews at NASA’s Michoud Assembly Facility lift the aft liquid oxygen tank (LOX) barrel out of the Vertical Weld Center (VWC) for its next phase of production. The aft barrel will eventually be mated with the forward barrel and the forward and aft domes to form the LOX tank, which will be used in the Space Launch System’s (SLS) Artemis IV mission. The LOX tank holds 196,000 gallons of super-cooled liquid oxygen to help fuel four RS-25 engines. The SLS core stage is made up of five unique elements: the forward skirt, liquid oxygen tank, intertank, liquid hydrogen tank, and the engine section. The liquid oxygen hardware, along with the liquid hydrogen tank will provide propellant to the four RS-25 engines to produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon. Together with its four RS-25 engines, the rocket’s massive 212-foot-tall core stage — the largest stage NASA has ever built — and its twin solid rocket boosters will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more pay
- Date
- 2022-05-10
- Photographer / author
- Michael DeMocker
- Collection
- MAF
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis IV Liquid Oxygen Tank Aft Barrel Moves to Next Phase of Production" (2022-05-10). NASA/MAF/Michael DeMocker. Public domain. https://images.nasa.gov/details/MAF_20220510_CS4_LoxAftLift16Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 82590.
More like this
/MAF_20240201_CS3_LOX_VACtoCellD_03(EB)~medium.jpg)
Crews Lift SLS Liquid Oxygen Tank into Cell D at NASA Michoud
2024-02-01 · NASA Image and Video Library

NASA Moves Artemis IV Engine Section
2022-06-20 · NASA Image and Video Library

NASA Readies Artemis IV
2022-05-12 · NASA Image and Video Library

NASA Readies Artemis II with the Core Stage Forward Join
2021-04-23 · NASA Image and Video Library

Artemis III Liquid Oxygen Tank Moves to Vertical Configuration at Michoud
2025-07-12 · NASA Image and Video Library

NASA Readies Artemis II with the Core Stage Forward Join
2021-04-28 · NASA Image and Video Library

Fourth Liquid Hydrogen Tank for NASA’s Space Launch System Rocket Assembled
2025-11-14 · NASA Image and Video Library
