Construction of the Hangar at the New Aircraft Engine Research Laboratory
Northward view of the Flight Research Building's steel framework in August 1941 as it neared completion at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory. The 272- by 150-foot hangar had a 90-foot clearance at its highest point. The hangar was the first structure built and was needed as a shelter for the growing staff, who occupied a nearby Farm House at this point. In January 1941 the Cleveland-area R.P. Carbone Construction Company was selected to build the hangar. Over the ensuing months, however, the NACA management became frustrated by the slow progress on the project. Although Carbone was contracted to complete the entire hangar by August, it was September before even the structural steel frame, seen in this photograph, was in place. Officials estimated the roof and siding were four months behind schedule. This was a serious concern because the lab’s research, support and administrative staff members would soon begin arriving. By mid-September the transite walls began enclosing the skeleton. In October work began on the temporary offices inside. The building was completed in mid-December just in time for the staff arriving from Lang
- Date
- 1941-08-23
- Collection
- GRC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Construction of the Hangar at the New Aircraft Engine Research Laboratory" (1941-08-23). NASA/GRC. Public domain. https://images.nasa.gov/details/GRC-2011-C-00334Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 25291.
More like this

Construction of the 40x80 Foot Wind Tunnel at Ames.
1943-07-07 · NASA Image and Video Library

Construction of the Fan Drive Enclosure of the 40x80 Foot Wind Tunnel at Ames.
1943-08-26 · NASA Image and Video Library

Wind Tunnel Complex at the Aircraft Engine Research Laboratory
1945-09-23 · NASA Image and Video Library

Construction of the Ring leading to the Test Section of the Ames 40x80 Foot Wind Tunnel.
1943-08-26 · NASA Image and Video Library

Construction Office in Farm House at the Aircraft Engine Research Laboratory
1941-11-23 · NASA Image and Video Library

Aerial View of the Nearly Completed 40x80 Foot Wind Tunnel at Ames
1943-11-04 · NASA Image and Video Library

Altitude Wind Tunnel Drive Fan being Assembled
1943-07-23 · NASA Image and Video Library

Altitude Wind Tunnel Drive Motor Installation
1943-07-23 · NASA Image and Video Library
