Generator hall of the powerhouse, Chickamauga Dam, Tenn. The dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River, has an authorized power installation of 81,000 kw., which can be increased to a possible ultimate of 108,000 kw. The reservoir at the dam adds 377,000 acre-fe
- Date
- 1942-06
- Collection
- FSA/OWI
- Archive
- Library of Congress (via Wikimedia Commons)
- Type
- photograph
- Original size
- 1,024 × 830 pixels
Public domainsafest
Reason: a US government work (Farm Security Administration / Office of War Information).
Read from: Commons licence category: PD US FSA/OWI; no CC BY, CC BY-SA, GFDL or deletion tag on the file page; permission field: Rights Advisory: No known restrictions on publication..
Credit line
"Generator hall of the powerhouse, Chickamauga Dam, Tenn. The dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River, has an authorized power installation of 81,000 kw., which can be increased to a possible ultimate of 108,000 kw. The reservoir at the dam adds 377,000 acre-fe" (1942-06). FSA/OWI. Library of Congress, Prints and Photographs Division, via Wikimedia Commons. Public domain. https://commons.wikimedia.org/wiki/File:Generator_hall_of_the_powerhouse,_Chickamauga_Dam,_Tenn._1a35264v.jpgNeed photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 119913.
More like this

Generator hall of the powerhouse, Chickamauga Dam, Tenn. The dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River, has an authorized power installation of 81,000 kw., which can be increased to a possible ultimate of 108,000 kw. The reservoir at the dam adds 377,000 acre-fe
1942-06 · Library of Congress

Chickamauga Dam generator hall
1942-06 · Library of Congress

Eight generator units in the generator room of a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity, Ala. Located 260 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 288,000 kw., which can be increased to a possible ultimate of 4
1942-06 · Library of Congress

Eight generator units in the generator room of a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity, Ala. Located 260 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 288,000 kw., which can be increased to a possible ultimate of 4
1942-06 · Library of Congress

Generator works at the winding of a generator stator in a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity, Ala. Located 260 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 288,000 kw., which can be increased to a possible ulti
1942-06 · Library of Congress

Generator works at the winding of a generator stator in a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity
1942-06 · Library of Congress

Generator works at the winding of a generator stator in a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity, Ala. Located 260 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 288,000 kw., which can be increased to a possible ulti
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the Tennessee Valley Authority hydroelectric plant at Watts Bar Dam
1942-06 · U.S. National Archives