Interim Cryogenic Propulsion Stage (ICPS) Handover Signing
Meeting in the Launch Control Center of NASA's Kennedy Space Center in Florida, officials of the agency's Spacecraft/Payload Integration and Evolution (SPIE) organization formally turn over processing of the Space Launch System (SLS) rocket's Interim Cryogenic Propulsion Stage (ICPS) to the center's Ground Systems Development and Operations (GSDO) directorate. The ICPS is the first integrated piece of flight hardware to arrive in preparation for the uncrewed Exploration Mission-1. With the Orion attached, the ICPS sits atop the SLS rocket and will provide the spacecraft with the additional thrust needed to travel tens of thousands of miles beyond the Moon.
- Date
- 2017-10-26
- Photographer / author
- NASA/Cory Huston
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Interim Cryogenic Propulsion Stage (ICPS) Handover Signing" (2017-10-26). NASA/KSC/NASA/Cory Huston. Public domain. https://images.nasa.gov/details/KSC-20171026-PH_CSH01_0001Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 82714.
More like this

ICPS Turnover GSDO Employee Event
2017-11-07 · NASA Image and Video Library

Artemis I SSL ICPS Lift and Mate
2021-07-05 · NASA Image and Video Library

Artemis I SLS ICPS Lift and Mate
2021-07-05 · NASA Image and Video Library

ICPS Turnover GSDO Employee Event
2017-11-07 · NASA Image and Video Library

ICPS Turnover GSDO Employee Event
2017-11-07 · NASA Image and Video Library

Artemis II Integration in High Bay
2025-07-24 · NASA Image and Video Library

Astronauts Visit To MPPF
2021-04-06 · NASA Image and Video Library

SLS Booster Aft Exit Cone Arrival
2019-11-04 · NASA Image and Video Library
