KSC-06pd0409
KENNEDY SPACE CENTER, FLA. - Off-loading of the redesigned external fuel tank that will launch Space Shuttle Discovery on the next shuttle mission, STS-121, begins in the Launch Complex 39 turn basin. The Pegasus barge delivered the tank from the Michoud Assembly Facility in New Orleans to NASA's Kennedy Space Center. After off-loading, the tank will be moved into the Vehicle Assembly Building and lifted into a checkout cell for further work. The tank, designated ET-119, will fly with many major safety changes, including the removal of the protuberance air load ramps. A large piece of foam from a ramp came off during the last shuttle launch in July 2005. The ramps were removed to eliminate a potential source of damaging debris to the space shuttle. The next launch of Discovery is scheduled for May 2006.
- Date
- 2006-03-01
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"KSC-06pd0409" (2006-03-01). NASA/KSC. Public domain. https://images.nasa.gov/details/KSC-06pd0409Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 85951.
More like this

KSC-06pd0411
2006-03-01 · NASA Image and Video Library

KSC-06pd0403
2006-03-01 · NASA Image and Video Library

KSC-06pd0408
2006-03-01 · NASA Image and Video Library

KSC-06pd0412
2006-03-01 · NASA Image and Video Library

KSC-06pd0413
2006-03-01 · NASA Image and Video Library

KSC-06pd0407
2006-03-01 · NASA Image and Video Library

KSC-06pd0401
2006-03-01 · NASA Image and Video Library

KSC-06pd0410
2006-03-01 · NASA Image and Video Library
