KSC-2009-2450
CAPE CANAVERAL, Fla. – Space shuttle Atlantis slowly crawls across the top of Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollout from the Vehicle Assembly Building. The shuttle sits atop the mobile launcher platform, which is carried by the crawler-transporter beneath. First motion was at 3:54 a.m. EDT and Atlantis was secured on the pad at 11:17 a.m. The 3.4-mile trip took about seven-and-a-half hours. Atlantis is targeted to lift off May 12 to service NASA's Hubble Space Telescope. During Atlantis' 11-day mission, the crew of seven astronauts will make the final shuttle flight to Hubble. During five spacewalks, they will install two new instruments, repair two inactive ones and replace components. The result will be six working, complementary science instruments with capabilities beyond what is now available, and an extended operational lifespan for the telescope through at least 2014. Photo credit: NASA/Jack Pfaller
- Date
- 2009-03-31
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"KSC-2009-2450" (2009-03-31). NASA/KSC. Public domain. https://images.nasa.gov/details/KSC-2009-2450Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 17818.
More like this

KSC-2009-2449
2009-03-31 · NASA Image and Video Library

KSC-2009-2442
2009-03-31 · NASA Image and Video Library

KSC-2009-2451
2009-03-31 · NASA Image and Video Library

KSC-2009-2454
2009-03-31 · NASA Image and Video Library

KSC-2009-2453
2009-03-31 · NASA Image and Video Library

KSC-2009-2443
2009-03-31 · NASA Image and Video Library

KSC-2009-2446
2009-03-31 · NASA Image and Video Library

KSC-2009-2440
2009-03-31 · NASA Image and Video Library
