KSC-2012-3499
CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 1 at NASA’s Kennedy Space Center in Florida, technicians move the Hyster forklift into position for installation of replica shuttle main engine RSME number 2 on the space shuttle Atlantis. Three RSMEs were installed on Atlantis. The replicas were built in the Pratt & Whitney Rocketdyne engine shop at KSC to replace the space shuttle main engines SSMEs which will be placed in storage to support NASA's Space Launch System currently under development. The RSME installation is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18, 2012 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex during November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Glenn Benson
- Date
- 2012-06-26
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"KSC-2012-3499" (2012-06-26). NASA/KSC. Public domain. https://images.nasa.gov/details/KSC-2012-3499Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 87812.
More like this

KSC-2012-3497
2012-06-26 · NASA Image and Video Library

KSC-2012-3507
2012-06-26 · NASA Image and Video Library

KSC-2012-3498
2012-06-26 · NASA Image and Video Library

KSC-2012-3508
2012-06-26 · NASA Image and Video Library

KSC-2012-3496
2012-06-26 · NASA Image and Video Library

KSC-2012-3504
2012-06-26 · NASA Image and Video Library

KSC-2012-3503
2012-06-26 · NASA Image and Video Library

KSC-2012-3506
2012-06-26 · NASA Image and Video Library
