NASA Readies Artemis II Liquid Hydrogen Tank for Next Phase of Manufacturing
This image highlights the liquid oxygen tank, which will be used on the core stage of NASA’ Space Launch System rocket for Atremis II, the first crewed mission of NASA’s Artemis program, at NASA’s Michoud Assembly Facility. The SLS core stage is made up of five unique elements: the forward skirt, liquid oxygen tank, intertank, liquid hydrogen tank, and the engine section. The forward skirt houses flight computers, cameras, and avionics systems. The liquid oxygen tan holds 196,000 gallons of liquid oxygen cooled to -297°F. The LOX hardware sits between the core stage’s forward skirt and the intertank; and along with the liquid hydrogen tank, it will fuel four RS-25 engines to produce two million pounds of thrust. Together with its four RS-25 engines, the rocket’s massive 212-foot-tall core stage — the largest stage NASA has ever built — and its twin solid rocket boosters will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Human Land
- Date
- 2021-03-03
- Photographer / author
- NASA/Eric Bordelon
- Collection
- MAF
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"NASA Readies Artemis II Liquid Hydrogen Tank for Next Phase of Manufacturing" (2021-03-03). NASA/MAF/NASA/Eric Bordelon. Public domain. https://images.nasa.gov/details/MAF_20210303_ArtII_LH2_movePto48_epb_03Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 81908.
More like this

NASA Readies Artemis II Liquid Hydrogen Tank for Next Phase of Manufacturing
2021-03-03 · NASA Image and Video Library

NASA Readies Artemis II Liquid Oxygen Tank for Next Phase of Manufacturing
2021-02-13 · NASA Image and Video Library

NASA Readies Artemis II Liquid Oxygen Tank for Next Phase of Manufacturing
2020-11-06 · NASA Image and Video Library
