Space Shuttle Project
The Space Shuttle Orbiter Columbia's (STS-75) mission came to a close as the orbiter touched down on Runway 33 of Kennedy Space Center's Shuttle Landing Facility on March 9, 1996. Off to the right is the Vehicle Assembly Building and the Shuttle Training Aircraft (STA). The Mate/Demate Device (MDM) is at left. This Marshall Space Flight Center managed mission lasted 15 days and 17-hours, during which time the seven member crew conducted microgravity research with the U.S. Microgravity Payload (USMP-3), which flew for the third time. The other primary payload was the Tethered Satellite System (TSS-1R),a reflight from an earlier mission, but the satellite was lost when the tether broke just short of its fully deployed length of nearly 13 miles.
- Date
- 1996-03-09
- Collection
- MSFC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Space Shuttle Project" (1996-03-09). NASA/MSFC. Public domain. https://images.nasa.gov/details/9603751Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 86863.
More like this

Space Shuttle Project
1996-02-22 · NASA Image and Video Library

Space Shuttle Project
1997-07-17 · NASA Image and Video Library

Space Shuttle Project
1995-11-05 · NASA Image and Video Library

Space Shuttle Project
1992-08-08 · NASA Image and Video Library

Space Shuttle Project
1994-03-18 · NASA Image and Video Library

Landing of the STS-62 Space Shuttle Columbia at Kennedy Space Center
1994-03-18 · NASA Image and Video Library

Space Shuttle Project
1996-07-07 · NASA Image and Video Library

Space Shuttle Project
1992-07-09 · NASA Image and Video Library
