Swinging a form for the concrete high speed basin into place. The workmen are standing in the place where the unique concrete hinges of the arched roof will be
4 x 5 in. or smaller
- Date
- 1938
- Collection
- Harris & Ewing
- Archive
- Library of Congress (via Wikimedia Commons)
- Type
- photograph
- Original size
- 8,062 × 10,089 pixels
Public domainsafest
Reason: Harris & Ewing collection, given to the Library of Congress without copyright restrictions.
Read from: Commons licence category: PD-Harris-Ewing; no CC BY, CC BY-SA, GFDL or deletion tag on the file page; permission field: No known restrictions on publication. For more information, see Harris & Ewing Photographs - Rights and Restrictions Inf.
Credit line
"Swinging a form for the concrete high speed basin into place. The workmen are standing in the place where the unique concrete hinges of the arched roof will be" (1938). Harris & Ewing. Library of Congress, Prints and Photographs Division, via Wikimedia Commons. Public domain. https://commons.wikimedia.org/wiki/File:Swinging_a_form_for_the_concrete_high_speed_basin_into_place._The_workmen_are_standing_in_the_place_where_the_unique_concrete_hinges_of_the_arched_roof_will_be_LCCN2016874348.jpgNeed photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 297374.
More like this

Workmen making up sections of the vaulted roof. When the steel skeleton is completed, it is swung into position on the foundation by a gigantic crane. Each section is about 12 feet wide and 112 feet across. When in position, concrete is poured forming a solid roof
1938 · Library of Congress

While construction is underway, the uncompleted sections of the roof must be mobile in order that a perfect fit may be made. Steel rails are laid and the sections of roof mounted upon them, allowing the giant pieces to be moved by a small crew with block and tackle
1939 · Library of Congress

U.S. to have world's greatest ship-testing basin. Carderock, MD., March 21. Work is rapidly going forward on the new U.S. Navy ship- testing basin now under construction here. It will be the largest ship-testng basin in the world and will have cost three million dollars when completed, 3/21/38
1938 · Library of Congress

"First 8-cubic yard batch of concrete being placed in Boulder Dam."
1933-06-06 · U.S. National Archives

"Placing concrete in panel forms near downstream toe in Boulder Dam foundation. An 8-cubic yard bottom-dump bucket handled over cableway is in use."
1933-06-26 · U.S. National Archives

"Placing concrete in sidewall forms of Nevada spillway of Boulder Dam. Concrete is being handled by crane in 2-cubic yard bottom-dump bucket supplied from truck-mounted agitators operated from high level concrete mixing plant."
1933-06-10 · U.S. National Archives

"Placing concrete in panel or column forms near downstream toe in Boulder Dam foundation. An 8-cubic yard bucket handled over cableway is in use."
1933-06-26 · U.S. National Archives

Construction on new Federal Reserve building
1936 · Library of Congress