Artemis II SM Move to Fast Cell
The European Service Module (ESM) for NASA’s Artemis II mission is secured inside the FAST (final assembly and system testing) cell in the high bay of the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on May 22, 2023. The ESM is in the FAST cell for final checkouts before it is stacked with the Orion crew module. Technicians are removing the crane that was used to move the ESM. The powerhouse that will fuel and propel Orion in space, the ESM will be used for Artemis II, the first Artemis mission flying crew aboard Orion.
- Date
- 2023-05-22
- Photographer / author
- NASA/Amanda Stevenson
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis II SM Move to Fast Cell" (2023-05-22). NASA/KSC/NASA/Amanda Stevenson. Public domain. https://images.nasa.gov/details/KSC-20230522-PH-AMS01_0015Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 10444.
More like this

Artemis II SM Move to Fast Cell
2023-05-22 · NASA Image and Video Library

Artemis III Orion Crew and Service Module Mate
2026-07-31 · NASA Image and Video Library

Artemis III ESM3 Engine Nozzle Install Completion
2026-02-17 · NASA Image and Video Library

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library

Artemis IV European Service Module
2026-07-31 · NASA Image and Video Library

Artemis II Heat Shield Installation
2023-06-23 · NASA Image and Video Library

Artemis I Orion Lift & Mate
2021-10-20 · NASA Image and Video Library

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library
