Artemis II Orion Lift Pre Saw Installation
Rebekah Tolatovicz, a technician with Lockheed Martin, operates a 30-ton crane to move NASA’s Artemis II Orion spacecraft out of the Final Assembly and System Testing cell inside the Neil A. Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Saturday, Feb. 22, 2025. The move prepares for the upcoming installation of four solar array wings and spacecraft adapter jettison fairings for the agency’s first crewed flight test under the Artemis campaign.
- Date
- 2025-02-22
- Photographer / author
- NASA/Cory S Huston
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis II Orion Lift Pre Saw Installation" (2025-02-22). NASA/KSC/NASA/Cory S Huston. Public domain. https://images.nasa.gov/details/KSC-20250222-PH-CSH01_0041Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 10401.
More like this

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library

Artemis II SM Move to Fast Cell
2023-05-22 · NASA Image and Video Library

Artemis II SM Move to Fast Cell
2023-05-22 · NASA Image and Video Library

Artemis II Heat Shield Installation
2023-06-23 · NASA Image and Video Library

Artemis I Orion Lift & Mate
2021-10-19 · NASA Image and Video Library

Artemis III Engine Section 3 Boat Tail in HB2
2025-08-13 · NASA Image and Video Library

Artemis III Orion Crew and Service Module Mate
2026-07-31 · NASA Image and Video Library
