Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000
.
- Date
- 1942-06
- Photographer / author
- Palmer, Alfred T., photographer
- Collection
- FSA/OWI
- Archive
- Library of Congress (via Wikimedia Commons)
- Type
- photograph
- Original size
- 9,028 × 7,297 pixels
Public domainsafest
Reason: a US government work (Farm Security Administration / Office of War Information).
Read from: Commons licence category: PD US FSA/OWI; no CC BY, CC BY-SA, GFDL or deletion tag on the file page; permission field: No known restrictions on publication..
Credit line
"Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000" (1942-06). Palmer, Alfred T., photographer. Library of Congress, Prints and Photographs Division, via Wikimedia Commons. Public domain. https://commons.wikimedia.org/wiki/File:Checking_the_alignment_of_a_turbine_shaft_at_the_top_of_the_guide_bearing_in_TVA%27s_hydroelectric_plant,_Watts_Bar_Dam,_Tenn._Located_530_miles_above_the_mouth_of_the_Tennessee_River,_the_dam_LCCN2017878459.tifNeed photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 117484.
More like this

Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the Tennessee Valley Authority hydroelectric plant at Watts Bar Dam
1942-06 · U.S. National Archives

Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000 kw. The reservoi
1942-06 · Library of Congress

Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee
1942-06 · Library of Congress

Generator hall of the powerhouse, Chickamauga Dam, Tenn. The dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River, has an authorized power installation of 81,000 kw., which can be increased to a possible ultimate of 108,000 kw. The reservoir at the dam adds 377,000 acre-fe
1942-06 · Library of Congress

Maintenance mechanic in largest coal press in world, Combustion Engineering Co., Chattanooga, Tenn.
1942-06 · Library of Congress

Generator works at the winding of a generator stator in a new addition to TVA's hydroelectric plant at Wilson Dam, Sheffield vicinity, Ala. Located 260 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 288,000 kw., which can be increased to a possible ulti
1942-06 · Library of Congress