Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000 kw. The reservoi
.
- Date
- 1942-06
- Photographer / author
- Palmer, Alfred T., photographer
- Collection
- FSA/OWI
- Archive
- Library of Congress (via Wikimedia Commons)
- Type
- photograph
- Original size
- 7,813 × 6,368 pixels
Public domainsafest
Reason: a US government work (Farm Security Administration / Office of War Information).
Read from: Commons licence category: PD US FSA/OWI; no CC BY, CC BY-SA, GFDL or deletion tag on the file page; permission field: No known restrictions on publication..
Credit line
"Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000 kw. The reservoi" (1942-06). Palmer, Alfred T., photographer. Library of Congress, Prints and Photographs Division, via Wikimedia Commons. Public domain. https://commons.wikimedia.org/wiki/File:Tightening_a_nut_on_a_guide_vane_operating_seromotor_in_TVA%27s_hydroelectric_plant,_Watts_Bar_Dam,_Tennessee._Located_530_miles_above_the_mouth_of_the_Tennessee_River,_the_dam_has_an_LCCN2017878460.tifNeed photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 126035.
More like this

Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee
1942-06 · Library of Congress

Tightening a nut on a guide vane operating seromotor in TVA's hydroelectric plant, Watts Bar Dam, Tennessee. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000 kw. The reservoi
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the Tennessee Valley Authority hydroelectric plant at Watts Bar Dam
1942-06 · U.S. National Archives

Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn
1942-06 · Library of Congress

Checking the alignment of a turbine shaft at the top of the guide bearing in TVA's hydroelectric plant, Watts Bar Dam, Tenn. Located 530 miles above the mouth of the Tennessee River, the dam has an authorized power installation of 90,000 kw., which can be increased to a possible ultimate of 150,000
1942-06 · Library of Congress

Maintenance mechanic in largest coal press in world, Combustion Engineering Co., Chattanooga, Tenn.
1942-06 · Library of Congress

Maintenance man at the Combustion Engineering Co. working at the largest cold steel hydraulic press in the world, Chattanooga, Tenn. This press can shape steel plates several inches in thickness
1942-06 · Library of Congress