NASA Readies Artemis IV
Technicians at NASA’s Michoud Assembly Facility prepare to move the engine section of NASA’s Space Launch System rocket for Artemis IV to the Vertical Assembly Building for the next step in production. This hardware is the first large piece manufactured for the Artemis IV mission and makes up the lowest portion of the 212-foot-tall core stage. When complete, the engine section will house the four RS-25 engines and include vital systems for mounting, controlling and delivering fuel from the propellant tanks to the rocket’s engines. Together with its four RS-25 engines and its twin solid rocket boosters, it will produce 8.8 million pounds of thrust to send NASA’s Orion spacecraft, astronauts, and supplies beyond Earth’s orbit to the Moon and, ultimately, Mars. Offering more payload mass, volume capability, and energy to speed missions through space, the SLS rocket, along with NASA’s Gateway in lunar orbit, the Human Landing System, and Orion spacecraft, is part of NASA’s backbone for deep space exploration and the Artemis lunar program. No other rocket is capable of carrying astronauts in Orion around the Moon in a single mission. Photographed on Thursday, May 12, 2022. Image credit
- Date
- 2022-05-12
- Photographer / author
- Michael DeMocker
- Collection
- MAF
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"NASA Readies Artemis IV" (2022-05-12). NASA/MAF/Michael DeMocker. Public domain. https://images.nasa.gov/details/MAF_20220512_CS4_ESinVAB02Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 81630.
More like this

NASA Moves Artemis IV Engine Section
2022-06-20 · NASA Image and Video Library

NASA Readies Artemis III
2021-04-01 · NASA Image and Video Library

Artemis IV Liquid Oxygen Tank Aft Barrel Moves to Next Phase of Production
2022-05-10 · NASA Image and Video Library

NASA Readies Artemis III
2021-01-15 · NASA Image and Video Library

NASA Readies Artemis III
2021-01-07 · NASA Image and Video Library

NASA Readies Artemis II with the Core Stage Forward Join
2021-04-27 · NASA Image and Video Library

NASA, Boeing Move Artemis IV Rocket Hardware to Barge
2024-08-28 · NASA Image and Video Library
