Artemis II Orion Lift Pre Saw Installation
Crews with NASA and Lockheed Martin pose for a photo in front of NASA’s Artemis II Orion spacecraft inside the Neil A. Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Saturday, Feb. 22, 2025. Technicians operated a 30-ton crane to move the spacecraft from the Final Assembly and System Testing cell to prepare for upcoming installation of four solar array wings and spacecraft adapter jettison fairings for the agency’s first crewed flight test under the Artemis campaign.
- Date
- 2025-02-22
- Photographer / author
- NASA/Cory S Huston
- Collection
- KSC
- Archive
- NASA Image and Video Library
- Type
- photograph
Public domainsafest
Reason: a NASA work: not copyrighted in the United States.
Read from: NASA media usage guidelines: NASA material is not copyrighted in the US unless noted; no third-party credit or mark found.
Credit line
"Artemis II Orion Lift Pre Saw Installation" (2025-02-22). NASA/KSC/NASA/Cory S Huston. Public domain. https://images.nasa.gov/details/KSC-20250222-PH-CSH01_0082Need photos for a whole script? Add Find Any Photo to Claude and ask for this one by its id: 10395.
More like this

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library

Artemis II Orion Lift Pre Saw Installation
2025-02-22 · NASA Image and Video Library

Artemis II Crew Visits KSC
2025-01-16 · NASA Image and Video Library

Artemis II Crew with EGS
2023-08-07 · NASA Image and Video Library

Artemis II Crew Visits KSC
2025-01-16 · NASA Image and Video Library

Artemis II SM Move to Fast Cell
2023-05-22 · NASA Image and Video Library

Artemis II SM Move to Fast Cell
2023-05-22 · NASA Image and Video Library

Artemis II Crew Visits KSC
2024-11-19 · NASA Image and Video Library
